vipkt_flyer_-_april_2009

Compliance Dates

 

Inspection and Test under §180.407 (c)

Test or inspection
(cargo tank specification, configuration and service)

Date by which first test must be completed
(see note 1)

Interval period after first test

External Visual Inspection:

 

 

  • All Cargo tanks designed to be loaded by vacuum with full opening rear heads

September 1, 1991

6 months

  • All other cargo tanks

September 1, 1991

1 year

Internal Visual Inspection:

 

 

  • All insulated cargo tanks, except MC 330, MC331, MC338

September 1, 1991

1 year

  • All cargo tanks transporting lading corrosive to the tank

September 1, 1991

1 year

  • All other cargo tanks, except MC 338

September 1, 1995

5 years

Lining Inspection:

 

 

  • All lined cargo tanks transporting landing corrosive to the tank

September 1, 1991

1 year

Leakage Test:

 

 

  • All other cargo tanks except MC 338

September 1, 1991

1 year

  • MC 330 and MC 331 cargo tanks in chlorine service

September 1, 1991

2 years

Pressure Test:

 

 

(hydrostatic or pneumatic) (see Notes 2 &3)

 

 

  • All cargo tanks which are insulated with no manhole or insulated and lined, except MC 338

September 1, 1991

1 year

  • All cargo tanks designed to be loaded by vacuum with full opening rear heads

September 1, 1992

2 years

MC 330 & MC 331 Service:

  • Cargo tanks in chlorine

September 1, 1992

2 years

  • All other cargo tanks

September 1, 1995

5 years

Thickness Test:

 

 

  • All unlined cargo tanks transporting material corrosive to the tank, except MC 338

September 1, 1992

2 years

Note 1: If a cargo tank is subject to an applicable inspection or test requirement under the regulation in effect on December 30, 1990 and the due date (as specified by a requirement in affect on December 3,1990) for completing the required inspection or test occurs before the compliance date listed in Table 1, the earlier date applies.
Note 2: Pressure testing is not required for MC 330 & MC 331 cargo tanks in dedicated sodium metal service.
Note 3: Pressure testing is not required for uninstalled lined cargo tanks, with a design pressure or MAWP 15 psig or less, which receive an external visual inspection ad lining inspection at least once a year.